E20 | Glen Ridge Generational | QR Construction

The new two-story addition is framed, and the front porch is being rebuilt. Painting starts on the new wood windows. An interior wall is framed to straighten out a sag in the upper floor. Exterior colors are chosen, plumbing pipes are isolated from cold weather, and header-less window opening is framed. A foolproof method of laying out plumbing and electrical fixtures is shared.

More Episodes

E22 | Glen Ridge Generational | Next Level Tight

A custom jamb and threshold are built. Various water-resistive barriers are compared.

E21 | Glen Ridge Generational | Roughed In

A trip is taken to the Empire State Building and the new plumbing system is discussed.