E24 | First Period Gambrel | New Life

The hard work continues to ensure all features are properly woven into the original house, like the new granite veneer water table. The original roof boards are installed on the ceiling in the new ell. A new fieldstone wall creates a defined front entrance. The new plumbing manifold is explained. A young carpenter talks about his return to the trades. A window sash is installed in a door.

Other Shows You May Enjoy